Legislation Details

File #: AR-2026-0060    Version: 1 Name:
Type: Consent Status: Agenda Ready
File created: 3/4/2026 In control: City Council
On agenda: 4/6/2026 Final action:
Title: Lift Station Rehabilitation #9 and #38
Attachments: 1. Edgewater LS 9 Rehab, 2. Quote LS 9 Danus, 3. Edgewater LS 38 Rehab, 4. Quote LS 38 Danus
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

                     COUNCIL AGENDA ITEM

 

SUBJECT:

title

Lift Station Rehabilitation #9 and #38

body

 

DEPARTMENT:

Public Works

 

SUMMARY:

 

The City is requesting approval to proceed with the rehabilitation of two wastewater lift stations to ensure continued reliability and operational efficiency of the wastewater collection system.

Lift Station #9, located at 29 Silver Circle, requires rehabilitation, which will include replacement and upgrades of submersible wastewater pumps, control panels, Mission Communications system and service plan, electrical racks, and Mission RTU equipment.
Project Cost: $150,065.00

Lift Station #38, located at 147 Red Bass Lane, also requires rehabilitation, which will include replacement and upgrades of submersible wastewater pumps, control panels, Mission Communications system and service plan, electrical racks, and Mission RTU equipment.
Project Cost: $149,830.00

The rehabilitation of these lift stations is critical to maintaining the reliability, safety, and regulatory compliance of the City’s wastewater collection system. These improvements will reduce the risk of system failures, enhance monitoring capabilities, and support uninterrupted service to residents.

The pricing is based on a competitively bid contract that available to piggy-back (City of Clermont Annual Agreement No 2023-071) that is in the best interest of and  meets the needs of the City and follows the City’s purchasing policy, terms and conditions.

 

BUDGETED ITEM:                        Yes No Not Applicable

 

BUDGET AMENDMENT REQUIRED:                        Yes No Not Applicable

 

 

RECOMMENDED ACTION:

Authorize the rehabilitation of Lift Station #9 and Lift Station #38, including associated equipment and system upgrades, to maintain system reliability, regulatory compliance, and uninterrupted wastewater service.