Legislation Details

File #: SD-2405    Version: Name:
Type: Other Business Item Status: Passed
File created: 10/1/2025 In control: City Council
On agenda: 12/1/2025 Final action: 12/1/2025
Title: SD-2405: Request for Preliminary Plat and Construction Plan Approval for Deering Park Center Single Family Phase 1 located south of Indian River Boulevard within Deering Park Center.
Attachments: 1. Deering Park Center Site Map, 2. Deering Park Center Plat, 3. Deering Park Center Construction Plans
ITEM DESCRIPTION: Title SD-2405: Request for Preliminary Plat and Construction Plan Approval for Deering Park Center Single Family Phase 1 located south of Indian River Boulevard within Deering Park Center. Body OWNER: Deering Park 1 LLC APPLICANT: Sean Stefan LOCATION: South of Indian River Boulevard and West of Interstate I-95. AREA: 106.777 Acres PROPOSED USE: 250 unit single family home subdivision CURRENT LAND USE: Undeveloped - Pasture FLUM DESIGNATION: Mixed-Use with Conservation Overlay ZONING DISTRICT: Mixed-Use Planned Unit Development (MUPUD) Book:8532, Page:4832 VOTING DISTRICT: Council District 4, Councilperson Mike Thomas STAFF RECOMMENDATION: Approval PLANNING BOARD: October 8th, 2025 CITY COUNCIL: December 1st, 2025 OVERVIEW: The Planned Unit Development designation is a conditional zoning district intended to provide a flexible approach for unique and innovative land development proposals, which could not be accomplished under conventional zoning. A PUD establishes permitted uses and specific development requirements. A Conceptual Development Plan illustrates the general location and intensity of the land uses within the development. A PUD does not approve any specific development itself, but establishes the parameters for how a site can be developed. A PUD must be developed in accordance with the standards established in the approved PUD agreement and must comply with all other applicable development regulations such as stormwater, landscaping, tree preservation, traffic, etc. A preliminary plat is a recording of the subdivision of land into individual lots or parcels which allows for the construction of infrastructure through the approval of construction plans. The applicant submitted to the City of Edgewater for review of the preliminary plat on July 23rd, 2024. Seven (7) subsequent reviews have taken place; the Technical Review Committee has reviewed the following preliminary plat and construction plans and has found that the development meets the requirements of the Comprehensive Plan. Land Development Code, and the Second Amended and Restated Deering Park Center Mixed Use Planned Unit Development (MUPUD) Agreement recorded at Book 8532, Page 4832. The contracted City surveyor has also reviewed the preliminary plat and the comments have been addressed in the most recent submittal. MIXED USE PLANNED UNIT DEVELOPMENT AGREEMENT CONSISTENCY: Figure 1: Location Map The Second Amended and Restated Deering Park Center Mixed-Use Planned Unit Development Agreement provides the framework for the entire development. City staff have reviewed the submitted application against this development agreement. Deering Park Center has a minimum lot size of 50 feet in width with a depth of 115. Only 25 percent of lots within Deering Park Center are permitted to be 50 feet in width, the rest must be a minimum of 55 feet in width. As a result of this requirement, City staff have required the developer to track with each submittal a lot county inventory as shown below: This is further illustrated in Figure 2 which is color coded to the respective lot sizes. The applicant has provided a subdivision that meets the minimum lot size requirements. The applicant has provided lots that exceed the code minimums with regards to lot depth. The MUPUD requires a minimum of 115 feet of lot depth, the applicant in this submittal is providing all lots with a minimum depth of 120 feet. Figure 2: Conceptual Development Plan The Second Amended and Restated Deering Park Center Mixed Use agreement also establishes minimum setbacks. Upon review, staff have determined that the minimum setbacks established within the MUPUD are being adhered too. City staff have provided a screenshot below of both the Development Summary table on the left and on the right, MUPUD language: The Development agreement sets the maximum impervious surface and maximum building coverage identical at 70% of the lot area. The applican